EV charging infrastructure, wherever your fleet needs it

No civil works. No upfront investment.

Learn more

Mobile energy infrastructure

Ultra-fast off-grid energy as a service (EaaS)

Ultra-fast mobile charging infrastructure for fleets, companies and events. We deploy charging capacity without civil works or upfront investment.

48h Operational deployment
0€ Upfront investment
100% Off-grid available

The problem

EV adoption is growing. Infrastructure isn't.

While electric vehicle adoption accelerates, the electrical grid and construction permits remain the bottleneck holding back companies, events and fleets.

Deploying EV charging infrastructure the traditional way means civil works, power upgrades and months of permits. Wattson removes that barrier with off-grid mobile infrastructure, operational in 48 hours with zero upfront investment.

18-24 months

Time to obtain all necessary permits to install fixed charging infrastructure

CAPEX Investment

Civil works, charger installation and electrical power upgrade

Trusted by

Some of our clients

Voltio Voltio
Avis Avis
Hyundai Hyundai
RFEA RFEA
Europcar Europcar
Volvo Volvo
Enterprise Enterprise
Sixt Sixt
BYD BYD
Ultra-fast mobile EV charging infrastructure

How it works

Flexible. No civil works. No waiting.

Step 01: Tell us what you need

Just tell us your fleet size, location, and time window.

Step 02: We prepare your proposal

We understand your needs: • We analyse your fleet size, location and time window. • We calculate your energy requirements and determine the best solution. • We prepare your proposal as a service, with zero upfront costs.

Step 03: We deploy

Once you approve the proposal we coordinate and our units arrive operational within 48h.

Step 04: Charging begins

Your electric vehicles start charging instantly. • We provide a fully managed service — we handle everything. • Predictable costs with a fixed rate, no price fluctuations and no extras. • Pay only for what you use, with no dependency on fixed grid costs.

Solutions

Designed for every operation.

Fleets

Fleets


Ultra-fast charging for electric fleets: last-mile, carsharing, rent a car and corporate fleets. We guarantee on-time departure regardless of your facility's power limitations.

EV charging for fleets
Events

Events


Critical power for unique moments. Temporary charging infrastructure, ready in hours, without permanent installation. Zero risk.

EV charging for events
Companies

Companies


EV charging for your employees at the office. No civil works, no investment, no complications. Real ESG impact from day 1.

EV chargers for companies

Our solutions

Technology designed to operate as a service: Charging as a service (CaaS)

Wattson GO
Wattson GO Mobile ultra-fast charger

Mobile charger that operates completely independent from the electrical grid. We charge where and when you want, regardless of power availability.

  • Power 200 kW
  • Range 100 km in < 5 min
  • Connectors 2× CCS
  • Infrastructure 0 — 100% off-grid
Wattson BOX
Wattson BOX Semi-fixed off-grid charger

Ultra-fast charging points at your base without installation. Designed for recurring locations where you need permanent charging without grid dependency.

  • Power 320 kW
  • Installation 0 works · No grid connection
  • Connectors 2× CCS
  • Mobility Relocatable if you move premises

Calculate your savings

What does waiting for the grid cost you?

Compare fixed infrastructure cost vs. Wattson with your real data.

Calculate your savings with the ROI calculator

Lack of electrical infrastructure cannot stop you.

Request your free diagnosis — 15 min