Mobile energy infrastructure

EV charging energy wherever you need it.

Ultra-fast mobile charging infrastructure for fleets, companies and events. We deploy charging capacity without civil works or upfront investment.

48h Operational deployment
0€ Upfront investment
100% Off-grid available

The problem

EV adoption is growing. Infrastructure isn't.

While electric vehicle adoption accelerates, the electrical grid and construction permits remain the bottleneck holding back companies, events and fleets.

18-24 months

Time to obtain all necessary permits to install fixed charging infrastructure

CAPEX Investment

Civil works, charger installation and electrical power upgrade

How it works

Flexible. No civil works. No waiting.

01

Tell us what you need

Vehicles, location, time window. You get a proposal in under 24h.

02

We deploy in 48h

Our GO and BOX units arrive operational. No permits, no grid connection needed.

03

Your vehicles charge

Managed ultra-fast charging. You operate. We guarantee the energy.

Our solutions

Technology designed to operate where the grid doesn't reach.

Wattson GO Mobile ultra-fast charger

Mobile charger that operates completely independent from the electrical grid. We charge where and when you want, regardless of power availability.

  • Power 300 kW
  • Range 100 km in < 5 min
  • Connectors 2× CCS
  • Infrastructure 0 — 100% off-grid
Wattson BOX Semi-fixed off-grid charger

Ultra-fast charging points at your base without installation. Same power as GO, but designed for recurring locations where you need permanent charging without grid dependency.

  • Power 300 kW
  • Installation 0 works · No grid connection
  • Connectors 2× CCS
  • Mobility Relocatable if you move premises

Calculate your savings

What does waiting for the grid cost you?

Compare fixed infrastructure cost vs. Wattson with your real data.

Calculate your savings with the ROI calculator

Lack of electrical infrastructure cannot stop you.

Request your free diagnosis — 15 min