Real cases

Operations that couldn't wait.

Companies that chose Wattson when time and operational certainty were the only things that mattered.

Urban carsharing

Challenge: staff moving empty cars to chargers instead of operating the fleet

Wattson GOHot zone0 trips

Wattson GO in high-rotation zones. Energy goes to the car. Staff operates.

"Before, I was paying €0.28/kWh thinking I was saving, without accounting for the cost of my operators driving empty cars to chargers — a total cost 4X the charge itself. With Wattson I pay less and have cars available and clean whenever users need them outside the M30 and M40."

Director of Operations, urban carsharing

EV brand launch

Challenge: press test drives at a location with insufficient grid power

+40 vehicles3 days0 incidents

GO deployed before the first guest. No diesel generator, zero incidents.

"Wattson gave us the certainty that our launch in Guadalajara was viable, where the grid was insufficient to charge 10 EVs simultaneously. We saved 255.6 kg of CO2 (12 trees) in a two-day event, 82.4% vs. diesel generation."

Director of Marketing, premium EV brand
I want similar results for my company

Let's talk

Your personalised proposal in under 24h.

Tell us your case. No endless forms, no generic demos. A specialist contacts you directly.

Tell us what you need

Vehicles, location, time window. You get a proposal in under 24h.

We deploy in 48h

Our GO and BOX units arrive operational. No permits, no grid connection needed.

Your vehicles charge

Managed ultra-fast charging. You operate. We guarantee the energy.

We respond within 24 business hours. No commitment.

Lack of electrical infrastructure cannot stop you.

Request your free diagnosis — 15 min